ISSN 3080-8022(Print)
ISSN 3080-8030(Online)
Past Views
Copyright

ISSN 3080-8022(Print)
ISSN 3080-8030(Online)
CODEN:SOABCV
(International Standard Serial Identifier ·
Globally Unique Identifier)
Assigning Agency: Chemical Abstracts Service (CAS)
Editorial Board
Editor-in-chief
Zheng Wentao
Editor-in-Chief of Health Sciences
Professor Kaibin Huang/China
Research Alias:Baichuan
Deputy Editor-in-Chief
Xiaoming Li,72nd Group Army Hospital,People’s Liberation Army of China/Min Liu,Affiliated Hospital of Gansu University of Chinese Medicine,China/Xiabing Chen,China/Bishan Chen,China/Miaona Li,China/Shengmei Ye,China/Yili Zhang,China/Xiaomin Zhao,China/Dawen Peng,China/Jieping Xu,China / Suleman Khan,UK/Saraju P.Mohanty,USA/Gautam Srivastava,Canada(The above rankings are not in order)
Editorial Board Member
Shubin LiuPhD/Gansu Provincial Hospital of Traditional Chinese Medicine,China
Yuwei Zhang/Chongqing University,China
Assistant to the Editorial Board
Xiaojing Li,China
Journal Homepage
Online Subm.
Join Us
Index / Retrieve / Archive
DOI
Index Copernicus
EuroPub Publishing Company
Eurasian Science Journal Index(ESJI)
Yangtze River Repos.(cjwk.cn)
Open Access Library(OALib)
Kind Congress(Azerbaijan)
Research Bible
Sci Online
Baidu Baike
Editing and Publishing:
Quest Press Limited
Address:
7th Floor,D, No.19,Palawak
Lane,Macau
Telephone:
+853 6881 9699
Email:
QuestPress@hotmail.com
Web site:
http://sci.scionline2025.com


  首页 -> 往期阅览-> 2025年
《Sci Online》( ISSN 3080-8022、EISSN 3080-8030 ) Publisher:Quest Press Release Date:2025/10/9
10.12479/questpress-scionline.20250106 Open Access Downloaded 2 Viewed 50

 

Research and Practice on Risk Management in Tunnel Construction

ZhiYong Li
Jing Jin Ji Intercity Rapid Railway Investment Co., Ltd.; Xiong'an ,Hebei 070001, China
Abstract:Due to the complex geological conditions, enclosed construction environment, and intensive technical links involved, tunnel engineering faces numerous uncertain risks during the construction phase, which may easily lead to safety accidents, construction delays, and economic losses. Focusing on risk management in tunnel construction, this paper systematically sorts out the classification and characteristics of construction risks, and constructs a full-process management framework covering "risk identification, assessment, response, and monitoring". Combined with engineering cases, it analyzes the specific manifestations of geological risks, technical risks, management risks, and environmental risks, introduces the Analytic Hierarchy Process (AHP) and Fuzzy Comprehensive Evaluation Method to establish a risk assessment model, and proposes targeted risk response strategies and dynamic monitoring schemes. The research shows that a scientific risk management system can effectively reduce the probability of risks in tunnel construction, ensure the safe and efficient progress of the project, and provide a reference for risk management in similar tunnel engineering construction.
Keywords:Tunnel Construction; Risk Management; Risk Identification; Risk Assessment; Risk Monitoring
 
 
 
  Peer Review Editorial Services Research Ethics Policy Contributorship & Authorship About Quest Press / Macau Sino Int. Med. Press
  Global Indexing Copyright Licensing Data Sharing Policy Appeal/Correction/Retraction
  Online Submission To the Librarian Open Access Statement Misconduct Handling Policy
  Content Licensing Guidelines for Reviewers Quality Control Mechanism Academic Misconduct Screening Policy
  Advertising Policy Article Processing Charge (APC) Publication Ethics Policy Call for Editorial Board Members/Associate Editors/Peer Reviewers/Editors-in-Chief